Gaya APA
      Robbani, F. et al (2023).
    Analisis Manajemen Proyek Untuk Memepercepat Waktu Pembangunan Jalan Kereta Api Elevated Dengan Metode Time Cost Trade Off = Project management analysis to accelerate the construction time of elevated railway with time cost trade off method .
    Semarang:
  Politeknik Negeri Semarang.
  
Gaya MLA
      Robbani, Falah. et al.
    "Analisis Manajemen Proyek Untuk Memepercepat Waktu Pembangunan Jalan Kereta Api Elevated Dengan Metode Time Cost Trade Off = Project management analysis to accelerate the construction time of elevated railway with time cost trade off method".
    
    Semarang:
  Politeknik Negeri Semarang,
  2023.
  SKRIPSI DIGITAL.